2017_03_24 Ground Breaking RMP


2017_03_24 Ground Breaking CSP


2017_03_24 Ground Breaking RSR


2017_03_24 Ground Breaking KD


2017_03_24 Ground Breaking Prayer


2017_03_24 Ground Breaking Pano


2017_03_24 Ground Breaking Pano w_stone


2017_03_30 Building site excavation


2017_03_24 Cline Equipment


2017_03_24 Driveway Entrance


2017_03_31 Rain in building site


2017_03_30 Stone delivery


2017_03_30 Parking Lot w_roller


2017_04_03 Stone in building site


2017_04_06 Chris and Rusty gluing pipe


2017_04_06 Chris in sewer trench


2017_04_06 Sewer excavation


2017_04_06 First sewer pipe


2017_04_06 Site ready for foundation work


2017_04_06 Sewer stubbed into building


2017_04_10 Backfilling piers


2017_04_06 Water stubbed into building


2017_04_10 Digging holes for piers 1


2017_04_10 Band board installation


2017_04_10 Digging holes for piers 2


2017_04_10 Foundation crew arrives


2017_04_10 JLG machine delivered


2017_04_10 Foundation package delivered


2017_04_10 Laying out the foundation piers


2017_04_10 PermaColumns for foundation


2017_04_10 Spinning of the dirt


2017_04_17 Concrete pour 1


2017_04_17 Concrete pour 2


2017_04_17 Concrete pour 3


2017_04_17 Concrete pour 4


2017_04_17 Concrete pour 6


2017_04_17 Concrete pour 5


2017_04_17 Concrete pour 7


2017_04_17 First concrete for floor


2017_04_17 Pastor Ricky placing mesh


2017_04_17 Pastor Ricky w_Smally


2017_04_17 Sawing concrete


2017_04_17 Setting concrete grade


2017_04_26 Framing walls on the ground


2017_04_20 Finished floor with rain


2017_04_26 Cutting framing members


2017_04_26 Lumber package for framing


2017_04_27 Setting south trusses


2017_04_26 Walls ready to stand up


2017_04_27 Setting trusses


2017_04_27 Standing up the west wall


2017_04_28 Airlock south wall 2


2017_04_28 Airlock south wall


2017_05_01 Window framing


2017_05_02 Siding and windows on south


2017_05_02 Siding on north west end


2017_05_02 Windows and accent siding


2017_05_08 Crew on lift doing siding


2017_05_02 Windows and siding on south


2017_05_08 Siding on south east corner


2017_05_08 Sliding roofing off gradall


2017_05_09 Gradall with roofing on east side


2017_05_09 Rain on the floor


2017_05_09 Roofing the west side


2017_05_09 Roof finished


2017_05_09 Setting the scissor lifts inside


2017_05_10 Closing the north end siding


2017_05_10 Insulating the building


2017_05_10 Drying out the floor


2017_05_10 Setting the front door


2017_05_11 Framing the interior girts


2017_05_11 Interior wall finished


2017_05_11 Interior wall girts and vapor barrier


2017_05_11 Setting interior wall brackets


2017_05_11 Setting posts for interior wall


2017_05_12 Ceiling vapor barrier and ceiling panels


2017_05_12 FBI Crew minus one


2017_05_13 Overhead doors with Mike


2017_05_12 Interior framing done


2017_05_31 Breakers in panels


2017_05_15 Building is closed in


2017_05_31 Toby setting pans for panels


2017_05_31 Toby setting the meter


2017_06_05 Toby bolting wall plates


2017_06_05 Toby installing ground rod


2017_06_14 Toby installing ceiling conduit


2017_06_08 Terry and Scott framing offices


2017_06_08 Conduit up to the ceiling


2017_06_09 Rest rooms framed and decked


2017_06_09 Scott nailing floor decking


2017_06_12 Mark grading west dirt


2017_06_12 Skid steer grading west dirt


2017_06_13 West side rough grading


2017_06_14 East side rough grading


2017_06_30 RMP installing flex wiring


2017_07_08 Hanging the shop HVAC unit


2017_07_12 Toby wiring the panels


2017_07_19 RMP HVAC wiring outside


2017_07_17 Bathroom vents


2017_07_19 Shop HVAC ductwork


2017_07_26 Plumbing roughin mens room


2017_07_26 Scott hanging drywall


2017_07_27 First toilet working


2017_07_31 Office HVAC and water heater


2017_08_18 Data wiring in the walls


2017_08_23 Framing for bronze plaque


2017_08_24 Drywall delivery


2017_08_28 Drywall hanging in shop


2017_08_28 Drywall install lunch


2017_08_28 First sheet of drywall in offices


2017_08_28 Endeavor data pedestal


2017_08_28 Endeavor fiber optic install


2017_08_28 Endeavor fiber optic testing


2017_09_12 Drywall finishing office


2017_09_12 Drywall finishing shop


2017_09_25 CSP Painting office


2017_10_04 Ceiling hangers for drop ceiling


2017_09_26 Scott painting office


2017_11_03 Carol painting above kitchenette


2017_10_06 Scott vacuuming walls


2017_10_05 Terry hanging drop ceiling


2017_10_06 Lights in the drop ceiling


2017_10_06 RMP & Scott drop ceiling


2017_10_06 Scott hanging drop ceiling


2017_10_06 RMP office lights


2017_10_18 Office ceilings done


2017_10_18 Drop ceiling in office


2017_10_20 Terry painting overhead doors


2017_10_27 Propane tank and copper line


2017_10_27 Propane tank and truck


2017_10_27 Propane tank


2017_10_31 Sidewalk forms


2017_11_03 Backfilling sidewalk forms


2017_11_03 RMP compacting sidewalk fill


2017_11_09 Floating sidewalk


2017_11_09 Mark floating sidewalk


2017_11_09 John pouring concrete sidewalk


2017_11_09 John brooming sidewalk


2017_11_09 Pouring concrete sidewalk


2017_11_09 Scott Mark chalking lines


2017_11_09 Striking off sidewalk


2017_11_09 Sidewalk poured


2017_11_10 Mark sawing relief joints


2017_11_16 Installing drains on east side of building


2017_11_16 RMP Backfilling drain trench


2017_11_16 RMP Scott gluing pipe


2017_11_16 RMP excavating drain trench


2017_11_17 Backfilling dirt into drain trench


2017_11_17 Placing concrete stoop northeast


2017_11_17 Connecting downspouts to drain


2017_11_18 Storm water flowing


2017_11_20 Preping for concrete on east side


2017_11_20 Rough stone for concrete pad


2017_11_22 Forms for east unloading area


2017_12_04 Painting trim


2017_11_30 Terry hanging double doors


2017_12_01 Insulation 1


2017_11_30 Terry hanging doors


2017_12_12 Terry installing trim


2017_12_01 Insulation 2


2017_12_01 Insulation 3


2017_12_01 Insulation 4


2017_12_01 Insulation 5


2017_12_01 Insulation 6


2017_12_01 Lauren cleaning the floors 2


2017_12_01 Lauren cleaning the floors


2017_12_01 Pouring east slab 1


2017_12_01 Pouring east slab 2


2017_12_01 Pouring east slab 3


2017_12_01 Pouring east slab 4


2017_12_01 Pouring east slab 5


2017_12_01 Pouring east slab 6


2017_12_01 Pouring east slab 7


2017_12_01 Pouring east slab 8


2017_12_01 Pouring east slab 9


2017_12_02 Cleaning shop floor 1


2017_12_02 Cleaning shop floor 2


2017_12_01 Pouring east slab 10


2017_12_02 Cleaning shop floor 3


2017_12_02 Cleaning shop floor 4


2017_12_02 Mark sawing the east concrete


2017_12_02 Sealing the concrete


2017_12_08 RMP Toby installing rotary converter


2017_12_08 Toby installing the rotary converter


2017_12_12 Building pallet racks


2017_12_14 Scott building shipping workstation


2017_12_15 David Page Scott packing paper


2017_12_16 Foreign languages moved


2017_12_16 Moving Gaylord boxes


2017_12_19 First machines moved


2017_12_20 Carter and Tyler


2017_12_20 Moving shelves


2017_12_19 Moving the Ricoh


2017_12_20 Our Hazelwood moving friends


2018_01_10 Carol cutting tracts


2018_01_10 Folder_cutter area